The project management plan
The project management plan is often confused with the schedule. The schedule answers “what and when”; the management plan answers “how we will run the project”: how decisions are made, how dates are controlled, what happens to risks and changes. A good plan is short: people read it rather than file it away.
What the plan contains
1. Goal and scope
- The goal and measurable success criteria.
- What is in the project and what is not.
- The key deliverables handed to the customer.
This part usually comes from the project charter.
2. Work breakdown and schedule
- The work breakdown structure — exactly what has to be done.
- A schedule with dependencies and milestones — usually a Gantt chart.
- The baseline: which dates are approved and how they may change.
3. Team and responsibilities
- Roles: sponsor, project manager, workstream owners.
- A responsibility matrix (RACI) for the key deliverables.
- Who can make which decisions.
4. Risks
- How risks are identified and rated.
- Probability and impact scales.
- How often the risk register is reviewed and what happens to red-zone risks.
5. Communication
- Regular meetings: which, with whom, how often.
- Reports: what a status report contains, who gets it, how often.
- Where documents, decisions and open issues are kept.
6. Change control
- Who can propose a change.
- How its effect on date, budget and scope is assessed.
- Who approves it and when the baseline changes.
7. Schedule and quality control
- How variance is measured: by task, milestone and project. See “Baseline and forecast”.
- What counts as “at risk” and what as “overdue”.
- Acceptance criteria for deliverables.
8. Closure
- How the result is accepted.
- What is handed over to operations.
- When the retrospective takes place and where lessons are kept.
How to make the plan useful
- One or two pages per section at most. If a section doesn’t fit, move the details to a separate document.
- Links, not copies. The schedule and risk register live in a system and the plan links to them — copies go stale within a week.
- Get it approved. A plan signed off by the sponsor is an agreement you can go back to in a dispute.
- Review it at phase boundaries. The plan changes with the project.
Common mistakes
- The plan is written as a formality and doesn’t answer “what do we do if…”.
- Dates and risks are copied into the document and never updated.
- There is no change procedure — and scope grows unnoticed.
Where to run it
In Etapero the living parts of the plan — the work breakdown, the schedule with its baseline, the risk register and open issues — are kept in the system rather than in copies, so the plan always shows the current state.