RACI responsibility matrix template

Who does the work, who answers for the result, who is consulted and who is informed — with a check that every row has exactly one accountable person.

Excel, 10 KB. No macros, no sign-up.

What is inside

  • The “RACI” sheet: deliverables or work in rows and six roles in columns.
  • A “Check” column: exactly one A and at least one R in every row.
  • Rows with a problem turn red, correct ones green.
  • An “Instructions” sheet.

How to use it

  1. List the project’s deliverables or major work in the rows.
  2. Rename the roles in the headers to fit your team.
  3. Fill in the letters: R — does the work, A — answers for the result, C — consulted, I — informed.
  4. Fix the rows the Check column marks red.

How it looks in Etapero

In Etapero the RACI matrix is built per project and exported to CSV. Loading the matrix from Excel into Etapero is not available yet.

Related articles

  • The project management plan

    The sections of a project management plan, how to keep it short and useful, and how it differs from the project schedule.

  • The work breakdown structure (WBS)

    How to build a project WBS: the 100% rule, levels and work packages, deliverable-oriented naming, an example structure and common mistakes.

Other templates

Try it yourself

The demo runs in your browser with no sign-up: you enter as a demo user and can edit the sample projects.

Open the demo